Top Grizzly Scalper


DescriptionVideoBrochure

CEC introduced a grizzly rock separator in 1991. It bolts on the top of our skid mounted grizzly, wheel mounted grizzly and has a grizzly base for static heavy duty rock use.

All grizzly bars bolt into the grizzly frame. The frame has a top and bottom bolt plate that allows you to pick different bar settings.

Our first unit we installed in Alaska in a large gold mine. The feature is fabricated tapered grizzly bars. The top of the grizzly bar is built of high Brinell, wear resistant steel. This assures long trouble free service.

This unit allows you to limit the in feed size to a vibrating grizzly when size control is required.


 


Product Information Request
Company Name:
First Name:
Last Name:
Address:
City:
State:
Zip:
Country:
Phone:
Email:
Subject:
Comment: